Ballast-line renewal and testing — example scenario

Spool fabrication, controlled installation and system acceptance testing in constrained working areas.

Spool fabrication, controlled installation and system acceptance testing in constrained working areas.

Target outcome: verify the renewed system at operating pressure and provide the vessel team with a controlled handover plan.

01Line survey
02Spool fabrication
03Supports and connections
04Pressure and functional test
Ballast-line renewal and testing — example scenario | SMSE Marine