Hull preparation, local repairs and coating-system application coordinated with the docking schedule.
Target outcome: document the critical hold points and prepare the coating system for handover within the planned docking window.
01Surface assessment
02Abrasive preparation
03Local steel repair
04DFT and final-coat inspection