Safe renewal of a damaged area through measurement, prefabrication, controlled fit-up and testing.
Target outcome: complete the critical work package through a controlled handover sequence that supports the vessel's onward schedule.
01Damage mapping
02Plate prefabrication
03Controlled weld sequence
04NDT and tightness test